Preparing airflow intelligence
Calibrating industrial-grade components and rendering the next section.

Client
Apollo Hospitals
Location
Delhi, India
Year
2023
100%
Fresh Air
−28%
HAI Reduction
65%
Heat Recovery
NABH
Compliance
A 600-bed hospital required 100% fresh air supply to ICUs, operation theatres, and isolation wards to prevent cross-contamination. Existing recirculating AHUs were flagged during NABH audit for infection control non-compliance.
Supplied Aerotech fresh air handling units with HEPA filtration, UV sterilization chambers, and centrifugal fans. Each unit delivers 100% outside air with heat recovery to minimize energy penalty. Stainless steel construction throughout for hygiene compliance.
NABH infection control compliance achieved. HAI (Hospital Acquired Infection) rate reduced by 28% in treated zones. Energy penalty of fresh air operation offset by 65% through heat recovery. NABH accreditation renewed without observations.